1Electrical & Mechanical Installation Project Design Independent Checking, Project Management, Testing & Commissioning Witnesses for government ordinance chapter 610, the Ordinance
www.beeo.emsd.gov.hk/en/mibec_beeo.html

1.1 The Ordinance applies to any "Newly Constructed Building" (prescribed building in Schedule 1 of the Ordinance,"new building" in respect of which a consent to the commencement of building works for superstructure construction is given after 21 Sept., 2012. The developers or building owners should ensure that the 4 key types of building services installation therein (air-conditioning installation, lighting installation, electrical installation as well as lift and escalator installation) comply with the design standards of the Building Energy Code (BEC). Schedule 1 of the Ordinance listed out ""Buildings That Require Certificate Of Compliance Registration And Form Of Compliance" as follows:

  • • Commercial building.
  • • A portion of a composite building that is not for residential or industrial use.
  • • Hotel and guesthouse.
  • • Common area of a residential building.
  • • Common area of a portion of a composite building that is for residential or industrial use.
  • • Common area of an industrial building.
  • • Building that is occupied principally for an education purpose.
  • • Building that is occupied principally as a community building including a community hall and social services centre and composite building occupied as 2 or more such places.
  • • Building that is occupied principally as a municipal services building including a market, cooked food centre, library, cultural centre and indoor games hall and composite building occupied as 2 or more such places.
  • • Building that is occupied principally for medical and health care services including a hospital, clinic and rehabilitation centre.
  • • Building that is owned by the Government and used principally for the accommodation of people during the performance of any function of the Government.
  • • Passenger terminal building of an airport.
  • • Railway station.
  • We provide consultancy services for above prescribed buildings:

  • • to certify a "stage one declaration" at design stage and to certify a "stage two declaration" at occupation approval stage
  • • to certify the specified forms after personally inspected the building services installation covered by the declaration, verify documents and sign the declaration
  • • to provide training to building owner, responsible person of a unit of a building and personnel responsible for maintaining building services installation for the knowhow to fulfill the requirements of the Ordinance.
  • 1.2 For Major Retrofitting Works (≥500m2 and defined in Schedule 3 of the Ordinance) in above prescribed buildings, we could help:

  • • to identify (according to related requirements in the Ordinance) energy efficient building services installation through site inspection before the decision of retrofitting details.
  • • to issue a "form of compliance" after personally inspected the building services installation and government submission.
  • • to provide training to responsible person of a unit of a building and personnel responsible for maintaining building services installation for the knowhow to fulfill the requirements of the Ordinance.
  • 1.3 According to schedule 4 of the Ordinance, "Buildings That Require Energy Audit" is:

  • • Commercial building.
  • • A portion of a composite building that is for commercial use.

  • The first energy audit in accordance with the Energy Audit Code (EAC) must be carried out for "Buildings Without Certificate Of Compliance Registration" according to the following timeframe (schedule 5 in the Ordinance):

    Date of issue of occupation approval in respect of the building   Period within which the first energy audit must be carried out   First Energy Audit



    On or after 1 January 1988   12 months from the commencement of Part 4 of this Ordinance   Before 21/9/2013



    After 31 December 1977 but before 1 January 1988   24 months from the commencement of Part 4 of this Ordinance   Before 21/9/2014



    After 31 December 1969 but before 1 January 1978   36 months from the commencement of Part 4 of this Ordinance   Before 21/9/2015



    On or before 31 December 1969   48 months from the commencement of Part 4 of this Ordinance   Before 21/9/2016

    The owners of commercial buildings (including the commercial portions of composite buildings, e.g. shopping malls under residential storeys) should carry out energy audit for the 4 key types of central building services installation every 10 years. We could conduct energy audit for you. We could also provide training to building owner, responsible person of a unit of a building and personnel responsible for maintaining building services installation for the knowhow to fulfill the requirements of the Ordinance.


    Contact us

    • Tel:(852)3575 9566
    • Fax:(852)3186 2930

    Address

    • Unit 2001, 20/F, Mongkok Commercial Centre,
    • 16 Argyle Street,
    • Mongkok, Kowloon,
    • Hong Kong

    Follow Us

    Search